[1]
Umar, M.A., Wibowo , K. and Mudiyono, R. 2021. ANALISIS WAKTU DAN BIAYA DENGAN METODE CRASHING, OVERLAPPING DAN GABUNGAN CRASHING OVERLAPPING: (STUDI KASUS PROYEK PEMBANGUNAN BENDUNGAN BENDO LANJUTAN DI KABUPATEN PONOROGO, PROVINSI JAWA TIMUR). Journal of Industrial Engineering & Management Research. 2, 5 (Aug. 2021), 24 - 43. DOI:https://doi.org/10.7777/jiemar.v2i5.190.