Umar, M. A., Wibowo , K., & Mudiyono, R. (2021). ANALISIS WAKTU DAN BIAYA DENGAN METODE CRASHING, OVERLAPPING DAN GABUNGAN CRASHING OVERLAPPING: (STUDI KASUS PROYEK PEMBANGUNAN BENDUNGAN BENDO LANJUTAN DI KABUPATEN PONOROGO, PROVINSI JAWA TIMUR). Journal of Industrial Engineering & Management Research, 2(5), 24 - 43. https://doi.org/10.7777/jiemar.v2i5.190