Umar, M. A., Wibowo , K. and Mudiyono, R. (2021) “ANALISIS WAKTU DAN BIAYA DENGAN METODE CRASHING, OVERLAPPING DAN GABUNGAN CRASHING OVERLAPPING: (STUDI KASUS PROYEK PEMBANGUNAN BENDUNGAN BENDO LANJUTAN DI KABUPATEN PONOROGO, PROVINSI JAWA TIMUR)”, Journal of Industrial Engineering & Management Research, 2(5), pp. 24 - 43. doi: 10.7777/jiemar.v2i5.190.