THE CONTRACT CHANGE ORDER ANLYSIS OF BRIDGE CONTRUSTION EMPLOYEES OF BIG HALL PROJECTS IMPLEMENTATION OF NATIONAL ROAD WHICH INFLUENCES THE TIME PERFORMANCE

  • Dwi Aneka Kartini Universitas Faletehan
  • Ghina Rizqandi Q.A Universitas Faletehan
Keywords: causative factors, dominant factors, change order, national bridge project, Patial Least Square (PLS)

Abstract

There is always problem of change order during the implementation of the project, either in first, middle, or the last project which involves the service user and the service provider. In every construction projects, there is always changing which called as change order (Jaydeep, et al, 2015). The change order could directly increase the cost of the project because of the additional material and volume, conflict of implementation schedule, rework, increase the overhead and increase the employees’ fee (Hanna, et al, 1999). The aim of this research is to find the causative factors of change order and identify the dominant factors which cause the change order which influences the time performance of the national bridge project. The data collecting technique of this research used survey and the previous research. The analysis method that was used to find the dominant factors was Partial Least Square (PLS). There are 28 dominant factors the cause of change order which influences the time performance on national road project. From the 28 dominant factors, they will divide in to 3 factor groups.

References

A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) Third Edition, Project Management Institute. 2004.

Al-Dubaisi, A.H. (2000). „Change orders in Construction Projects in Saudi Arabia’. M.Sc. Thesis, Faculty Of College Of Graduate Studies, king Fahad University of Petroleum and Minerals, Saudi Arabia.

Asiyanto. (2005). Construction Project Cost Management. Jakarta: PT. Pradnya Paramita.

Barrie, Donald S, and Paulson, Boyd C Jr. (1992). Professional Construction Management, third edition. Singapore, Mc Graw-Hill

FIDIC Red Book (2005), Conditions of Contract for Construction

Fisk, Edward R, and Reynolds Wayne D. (2006). Construction Project Administration, eight edition. New Jersey, Prentice Hall

Ghozali, I. 2008. “Structural Equation Modeling, Metode Alternatif dengan Partial Least Square.” Badan Penerbit Universitas Diponegoro, Semarang.

Hanna, Award S., Russel, Jeffrey S., Gotzion, Timothy W., Nordheim, Erick V (1999). “IMPact Of Change order On Labir Efficiency For Mechanical Construction” . Journal Of Construction Engineeering and management

Hsieh, Ting-Ya., Lu, Shih-Tong., and Wu, Chao-Hui (2004). “Statistical Analysis of Causes for Change order in Metropolitan Public Work”. International Journal of Project Management

Ibbs, W. dan Seth, G. (2009), “Managing Construction Projects Using the Advanced Programmatic Risk Analysis and Management Model”, Journal of Construction Engineering and Management

Jaydeep, N. D., Pitroda, J. dan Bhavsar, J. J. (2015), “A Review on Change order And Assessingcauses Affecting Change order in Construction”, Journal of International Academic Research for Multidisciplinary IMPact Factor, Vol. 2, No.12, 152–162

Keane, P., Sertyesilisik, B. and Ross, A. (2010), ‘Variations and Change orders on Construction Projects’. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

Lin, N. (1976). Foundations of Social Research. New York: McGraw-Hill Book CoMPany.

Murni, Imam Mustika (2007) Faktor penyebab, akibat, dan proses pengolahan change order pada proyek rumah tinggal di Surabaya. Master thesis, Petra Christian University.

Ndihokubwayo, R. and Haupt, T. (2009), “Variation Orders on Construction Projects: Value Adding or Waste”, International Journal of Construction Project Management.

O'Brien, James J.;Zilly, Robert G. (1991), “Contractor's Management”, Second Edition. Singapore, Mc Graw-Hill.

Peraturan Kepala LKP Nomor 2 tahun 2011 Tentang Standar Dokumen Pengadaan

Peraturan Menteri Pekerjaan Umum Nomor 14/PRT/M/2013

Peraturan Presiden Nomor 4 tahun 2015 Tentang Perubahan Keempat Atas Peraturan Presiden Nomor 54 Tentang Pengadaan Barang /Jasa Pemerintah.

Riduan. (2002). Skala Pengukuran Variabel-Variabel Penelitian. Alfabeta Bandung.

Sandy G.A., Sompie, B. F. dan Rantung, J.P. (2012), “Analisis Faktor-faktor Penyebab Change order dan Pengaruhnya Terhadap Kinerja Waktu Pelaksanaan Proyek konstruksi di Lingkungan Pemerintah Provinsi Sulawesi Utara”, Jurnal Ilmiah Media Engineering

Sarwono, J. (2006). Analisis Data Penelitian menggunakan SPSS. C.V Andi. Yogyakarta.

Schaufelberger, John E., and Holm, Len. (2002). Management of Construction Project A Constructor’s Perspective, New Jersey, Prentice Hall

Sidney M. Levy. (2002). Project management in construction, fourth edition: New York: McGraw-Hill.

Singarimbun, M., dan Effendi, S. (1987). Metode Penelitian Survey. PT.Pustaka LP3ES Indonesia.

Sitomorang, Y. G. (2009) Analisis Produktivitas Pekerja Proyek Konstruksi Pada Perusahaan Kontraktor Di Jakarta Laporan Tugas Akhir S1, TS FT. Universitas Atma Jaya Yogyakarta.

Soeharto, I. (1995). Manajemen Proyek, Dari Konseptual sampai ke Operasional. Jakarta:Erlangga.

Published
2024-05-13
How to Cite
Dwi Aneka Kartini, & Ghina Rizqandi Q.A. (2024). THE CONTRACT CHANGE ORDER ANLYSIS OF BRIDGE CONTRUSTION EMPLOYEES OF BIG HALL PROJECTS IMPLEMENTATION OF NATIONAL ROAD WHICH INFLUENCES THE TIME PERFORMANCE. Journal of Industrial Engineering & Management Research, 5(2), 31-41. https://doi.org/10.7777/jiemar.v5i2.520
Section
Articles