ANALISA PROSES PRODUKSI PERSENJATAAN PADA INDUSTRI SELONGSONG PELURU GUNA MEMPERKUAT PERTAHANAN NASIONAL
Abstrak
Large countries generally have large defenses and militaries as well. In a study, it was shown that one of the indicators of the assessment that the country was considered great was its military strength and completeness. The average time it takes to make 1 sleeve is 10 seconds. However, in data collection, the lathe process takes a longer time than other processes, which is 19-20 seconds. With this condition, the production results from the previous station will accumulate and the next station will have a waiting time. This is called an unbalanced production line. With this condition, line balancing must be carried out so that production results are maximized. The improvements planned by the researchers to make the production line more balanced are by adding a lathe line. By adding a line lathe, the cycle time is balanced. Thus the production process can run well and smoothly.
Referensi
Al Fakhri, Faiz.2013.Analisis Pengendalian Kualitas Produksi di PT. Masscom Graphy Dalam Upaya Mengendalikan Tingkat Kerusakan Produk Menggunakan Alat Bantu Statistik, (Online), (http://eprints.undip.ac.id/23023/, diakses 6 Okt’13).
Ariani, Dorothea Wahyu. 2004. Pengendalian Kualitas Statistik. Yogyakarta: ANDI Yogyakarta
Assauri, Sofjan. 1998. Manajemen Operasi dan Produksi. Jakarta : LP FE UI.
Asy’ari, Rorie. “Anggaran Pertahanan 2011 Naik 10,72 Persen.” Media Indonesia, 30 Desember 2010, diunduh dari http:/ / www. mediaindonesia. com/read/2010 /12/30/191881/17/1/ AnggaranPertahanan-2011-Naik-10,72-Persen, pada tanggal 5 April 2011, pukul 14.00 WIB.
Bhakti, Ikrar Nusa. Reformasi Sektor Keamanan: Sebuah Pengantar. Jakarta: IDSPS&DCAF, 2009
Griffin, A. (1993). Metric for Measuring Product Development Cycle Time. Journal Production Innovation Management, 10, 112–125.
Griffin, A. (1997). The Effect of Project and Process Characteristics on Product Development Cycle Time. Journal of Marketing Research, 34(1), 24–35. https://doi.org/10.1177/002224379703400103
Gupta, A. K., & Souder, W. E. (1998). Key drivers of reduced cycle time. Research Technology Management, 41(4), 38–43.
Indonesia. Kepustakaan Populer Gramedia, Jakarta.
Indrawan, Raden Mas Jerry dan Widiyanto, Bayu. Kebijakan Offset dalam Membangun Kemandirian Pertahanan Negara, Jurnal Pertahanan 06, No. 2.
International Institute for Strategic Studies.(2011). The Military Balance 2011, Routledge, London.
Ittner, C. D., & Larcker, D. F. (1997). Product Development Cycle time and Organizational Performance. Journal of Marketing Research, 34(1), 13–23. https://doi.org/10.1177/002224379703400102
Jong, J. R. (1957). The Effects Of Increasing Skill On Cycle time And Its Consequences For Time Standards. Ergonomics, 1(1), 51–60. https://doi.org/10.1080/00140135708964571
Karim, Silmy. (2014). Membangun Kemandirian Industri Pertahanan
Mankiw, N. Gregory. (2010). Macroeconomics 7th edition. World Publisher, New York.
Muhamad Haripin,”Problematika Industri Pertahanan Indonesia,” Website Pusat penelitian Politik LIPI, www.politik.lipi.go.id, 29 Juli 2011, diakses pada 12 Juni 2014.
Pasebani, Somayeh, Toroghinejad M.Reza,M. Hosseini, Jerzy Szpunarc, Textural Evolution Nano-grained 70/30 Brass Produced by Accumulative Roll Bonding, Material Science and Engineering A, vol.527, 2010, pp.2050-2056.
Rudiger, Dornbush, Stanley Fisher, Richard Startz. (1998). Macroeconomics 7th edition Sebastian, Elly. Peningkatan Peranan SDM Pertahanan Nasional guna Menghadapi Perang Generasi Keempat, Jurnal Pertahanan 05, No.1